SA Water

Morgan (4 sites) – Morgan Pump Station 1 / Maude Pump Station 2 / Geranium Plains Pump Station 3 / Robertstown Pump Station 4

Pump Station 1 – 6.13MW

Pump Station 2 – 5.87MW

Pump Station 3 – 5.87Mw

Pump Station 4 – 7.37MW

Tron Civil, carried out the following tasks on the above Pump Stations

  • Construction of laydown areas
  • HV and comms trenching with installation of comms pits
  • Installation of the Inverter Blocks
  • DC Trenching 
  • Construction of internal roads
  • Swale drains at PS1/PS3/PS4 with PS1 having also built two small evaporating ponds 
  • Construction of the Transformer Bunds at PS1/PS2/PS4.