Morgan to Whyalla Solar Project
SA Water
Morgan (4 sites) – Morgan Pump Station 1 / Maude Pump Station 2 / Geranium Plains Pump Station 3 / Robertstown Pump Station 4
Pump Station 1 – 6.13MW
Pump Station 2 – 5.87MW
Pump Station 3 – 5.87Mw
Pump Station 4 – 7.37MW
Tron Civil, carried out the following tasks on the above Pump Stations
- Construction of laydown areas
- HV and comms trenching with installation of comms pits
- Installation of the Inverter Blocks
- DC Trenching
- Construction of internal roads
- Swale drains at PS1/PS3/PS4 with PS1 having also built two small evaporating ponds
- Construction of the Transformer Bunds at PS1/PS2/PS4.